27. June 2024

Live more beautifully with wood – The future of building with Schönauer AG

27. June 2024

Since summer 2021, Schönauer AG has been working with the TW Concept Line in its new production hall in Marbach. Thanks to the advanced technology with an impressive length of 50 meters, the production line allows for the simultaneous processing of multiple elements. The TW-Mill E offers high processing flexibility, maximum efficiency and precision, for panel cutting, conventional joinery and gluing. The TW-Mill E element construction robot is used to produce wall, ceiling and roof elements, which are then assembled into modules depending on the project.

Discover the diverse possibilities of timber construction and find out more about our innovative processes and products.

You can find out more at the following link.

More

News

original-BC7D865B-8439-4683-9546-5C7DD5D367C1

Sporty, cool facade of a bouldering hall.

The facade reflects the impressive panorama of a mountain. The visual hike starts from the valley and leads through various intermediate stations up to the summit – a perfect reference to the movement pattern of the sport of bouldering. …
Aussichtsturm-Allgäu_1

A discovery with every step.

In a cooperation between the project partners ICD University of Stuttgart – Prof. A. Menges, ITKE University of Stuttgart – Prof. J. Knippers, State Garden Show Wangen 2024 and Blumer Lehmann, an innovative observation tower was developed for the …